This is the first court to decide the case, so there's no lower-court ruling.
TL;DR
1The government cleared hundreds of trees at East Potomac Golf Course, claiming it was necessary.
2The court decided to halt any further removals based on concerns about environmental impact and lack of urgency.
3The key reason is that the government acted too quickly without proper notice or studies.
Key issues
1
Did the government violate environmental laws by clearing trees?
Holding · Yes, the court found they acted without proper review required by law.
2
Can local golfers and the preservation group sue over this action?
Holding · Yes, they have standing since they use the golf course regularly and were harmed.
3
Is the government's tree-clearing plan final agency action?
Holding · Yes, the court considered it final since it led to immediate tree removal.
Why it matters
This case affects local golfers and the environment, as healthy trees are essential to the park's ecosystem.
If you were the judge?
The National Park Service cut down hundreds of trees without warning. Should they stop?
1In just five days, the government approved a plan to remove hundreds of trees from a popular golf course.
2Local golfers and a preservation group argue these trees were healthy and essential for the park's character.
3They rushed the decision without a proper environmental study or clear reasons for urgency, prompting the lawsuit.
Can the government keep clearing trees from East Potomac Golf Course?
Vote to earn 10 Verdict Points
Parties
Plaintiff
Dc Preservation League
Defendant
Department of Interior
Roles are inferred from the case caption.
Opinion of the court
UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA
DC PRESERVATION LEAGUE, et al.,
Case No. 1:26-cv-477-ACR
Plaintiffs,
v.
DEPARTMENT OF INTERIOR, et al.,
Defendants.
MEMORANDUM OPINION
In five daysâfrom Monday, October 5, 2026, to Friday, October 9, 2026âthe
Department of the Interior ordered, considered, and approved a plan to remove hundreds of trees
from the East Potomac Golf Course.1 Early the next morning, the National Park Service had
bulldozers on site. By dayâs end, it had removed about 430 healthy, non-invasive trees.2 From
contracting through completion, the effort required coordination among officials and employees
1
October 12, 2026, Rough Tr. 21:19â25, 22:1â3, 100:20â25, 101:1â5.
2
Id. at 9:6â7, 39:16â21. It would have removed hundreds more but for a rain delay. Dkt. 76-1
at 8.
1
from across DOI.3 The officials included the Deputy Chief of Staff for the Secretary of the
Department of the Interior, Greg Wischer; the Acting Director of the NPS, Jessica Bowron; the
Deputy Director of Operations for the NPS, Frank Lands; and the Superintendent of the National
Mall and Memorial Parks, Kevin Griess.4
Breakneck speed to clear trees that posed no harm. The reason? Disputed. The budget?
Unclear.5 The environmental impact? Unstudied.6 The urgency? None.7 Next steps: bulldoze
hundreds more.8
Plaintiffs ask the Court to temporarily restrain the Government from removing these
additional trees.9 They claim that the Tree Management Plan (TMP) is but one step in the
Governmentâs Washington National Plan, which, as Plaintiffs put it, seeks to âdestroy East
Potomac Golf Course.â10 They link the tree removal to President Donald J. Trumpâs
pronouncement that the Department of the Interior would begin work on September 1, 2026, to
âquicklyâ replace the East Potomac Golf Course with âone of the Greatest Golf Courses
anywhere in the World.â11
3
Oct. 12 Rough Tr. at 16:13â18:11.
4
Id. at 73:4â17, 75:4â10, 101:16â21, 104:9â23.
5
Id. at 48:8â13.
6
See Dkt. 76-1 at 9 (citing Kevin Griess, Categorical Exclusion Documentation Form (Oct. 9,
2026), https://perma.cc/ERL7-UHYV (CatEx Form 1)); Dkt. 76-2, Kevin Griess, Determination
of NEPA Adequacy When Taking a New Proposed Action and Making a New Decision (Oct. 11,
2026) (CatEx Form 2).
7
Oct. 12 Rough Tr. at 50:4â10, 78:17â21.
8
Dkt. 76-1 at 8.
9
See generally id.
10
Id. at 7â8, 11.
11
Dkt. 58 at 1 (citing Donald J. Trump, Truth Social (June 28, 2026, at 2:42 PM),
https://perma.cc/E3HB-7AUL) (June 28 Post).
2
The Government claims that the TMP implements a 2019 Cultural Landscape Report and
has nothing to do with the Washington National Plan.12 It is a coincidence, the Government
seems to suggest, that DOI cut down hundreds of trees at the Course weeks after the President
asked DOI to cut down trees at the Course,13 and not, say, any other time in the last seven years.
That asks rather a lot of coincidence. For now, Plaintiffs have satisfied the factors
necessary for the Court to enter a temporary restraining order prohibiting further implementation
of the TMP. They have shown a likelihood of success on jurisdiction: the individual plaintiffs
regularly golf at East Potomac Golf Course, and the TMP is final agency action. They have also
shown a likelihood of success on their National Environmental Policy Act (NEPA) claim as NPS
likely failed to comply with that statuteâs procedural and âhard lookâ requirements. They have
shown irreparable injury given that the imminent felling of hundreds of healthy, non-invasive
trees has no adequate remedy at law.
And the balance of the equities favors Plaintiffs given the professed lack of any
governmental interest in proceeding urgently to remove the remaining trees. At an October 12,
2026, emergency hearing, the Court heard from Griess, the individual who submitted the TMP
for approval and oversees its implementation. The following exchange occurred:
The Court: Is there any urgency of continuing with the tree removal?
Griess: Not that Iâm aware of, Your Honor.
The Court: So the trees could be cut down tomorrow, or they could be
cut down a month from now, and from the governmentâs
perspective, itâs basically the same?
Griess: From what I understand, Your Honor, yes.14
12
Dkts. 41â44 (CLR); Dkt. 74-1 ¶ 7.
13
See June 28 Post.
14
Oct. 12 Rough Tr. at 50:4â10.
3
For the reasons explained below, the Court GRANTS Plaintiffsâ Emergency Motion for
Temporary Restraining Order.15
BACKGROUND
This suit began in February 2026. Two frequent golfers at East Potomac Golf Course and
a non-profit dedicated to preserving the Park sued NPS and DOI. They allege that the
Governmentâs decision to âreplace the existing Golf Course with an elite championship-style
courseâ violates several provisions of the Administrative Procedure Act. Dkt. 1 ¶ 94. Concerned
that the Government would begin unlawful renovations, Plaintiffs also sought injunctive relief.
Id. ¶¶ 1â7; Dkt. 8. The Government moved to dismiss for lack of jurisdiction and failure to state
a claim and opposed any injunctive relief. Dkt. 34.
Since that initial stage, the Court has held multiple hearings to address the partiesâ
competing motions and Plaintiffsâ requests for injunctive relief.16 Core to the Governmentâs
defense was its claim that no final agency action had occurred. There was, the Government
repeatedly contended, âno final agency actionâ because it had not yet implemented the
Washington National Plan. July 2, 2026, Tr. 18:11, 20:9â18; see also Dkt. 48 at 4. There was
only âa goal,â July 2 Tr. at 18:11, 22, and a âconceptual proposal,â Dkt. 26 at 32, 40. Instead of
entering injunctive relief, the Court agreed to accept the Governmentâs repeated assurances that
it would notify Plaintiffs and the Court of any major developments at the Course outside of
ordinary maintenance. July 2 Tr. at 32:19â22, 34:9â17; September 3, 2026, Tr. 5:23â25.
15
Dkt. 76.
16
The procedural history in this case is complicated. The Court commends to the interested
reader the case docket. The Court does not address this history in detail on this emergency
posture.
4
On June 28, 2026, President Trump posted to Truth Social thatâhaving just toured East
Potomac Golf Course with âTom Fazio, the Great Golf Course Architect,â the DOI Secretary,
and others from that departmentââit was determined that . . . we will build one of the Greatest
Golf Courses anywhere in the World.â June 28 Post. âWork on the new Course, which will go
quickly, will begin on September 1st,â and â[i]t will be built through the Department of the
Interior.â Id.
Suffice it to say, Plaintiffs had questions. At a hearing on July 2, 2026, the Government
maintained that no final agency action had occurred, even though it acknowledged that âNPS and
Interior are now trying to meet that schedule.â July 2 Tr. at 8:19â9:11. âFrom the Presidentâs
mouth to their ears, Your Honor.â Id. at 9:4â5.
Plaintiffs asked again that the Court enter an injunction, or at least a formal order
requiring notice before the Government took any action on the Course. See id. at 70:5â23. But
the Court had not yet seen a basis to act. It stated, âif we get bulldozers on site and they start
mowing down half the golf course, . . . thatâs irretrievable, which is why the one thing I have
done is ask them not to do that before giving us all notice.â Id. at 60:6â10. The Court opted
instead to trust the Government to provide appropriate notice:
The Court: I want all you guys to get together in some meeting and
figure out some language that your client will agree to that I
sign off on, and itâs not going to be an injunction. The only
reason Iâm not making an injunction order is because I donât
want to put people through contempt proceedings. I want to
trust that people are acting in good faith and have them
acting in good faith until proven otherwise, and you have not
proven otherwise to me in this litigation.
Id. at 91:13â21.
In August, NPS removed dozens of trees from East Potomac Golf Course. Plaintiffs
again had questions. The Government explained that those trees met âone of four criteriaâ:
5
âhazardous, dead, dying, or invasive.â Sept. 3 Tr. at 7:1â2. â[O]ut of the approximately 3,800
trees in the park, there were 77 invasives that were removed, and 73 dead, dying or hazardous
that were removed.â Id. at 7:5â7. âNow thereâs also some additional trees that the government
has identified that will be subject to removal based on these criteria, no other criteria.â Id. at
8:17â19. âBut there is no implementation of a new design. Weâre talking less than 4 percent of
the total trees at the golf course that are being removed right now underneath these four criteria.â
Id. at 9:7â10.
Plaintiffs yet again requested that the Court order the Government to provide notice
before additional removals commenced. See id. at 24:18â20, 25:1â4. But the Court took the
Government at its word that âno other criteriaâ or plan existed for removing trees, id. at 8:19,
since removing âlive, healthy treesâ was something altogether different, id. at 13:10â16. And in
declining to enter a formal notification order, the Court had the following exchange with
Government counsel:
The Court: You know, my concern has always been from a place ofâand I
think that, you know, someone just showed me a New York Times
article about this recently, something about how, you know, the
administrationâs sort of improvement plans are just plans orâuntil
theyâre not, until theyâre sort of already done. And what Iâve said
from the get-go is that what I do not want is to be here with a fait
accompli. And I have made that very, very clear. Iâve made that
clear to [Counsel]. I think [Counsel] fully understands that. And I
am quite confident that the last thing [Counsel] wants to do is
come up here and tell me that something has happened thatâs
irrevocable, and that is an implementation of a plan that no one had
notice of. Right, [Counsel]?
Counsel: Yes, Your Honor.
The Court: Okay. So Iâm notâso ifâI mean, I have no reason to
disbelieve what heâs telling me. And if you donât have any
reason to disbelieve what heâs telling me, then I donât think
anything wrong has happened here. Because they have just
been doing what I said they could do, which was continue to
get rid of the invasive trees or to deal with the dying trees.
6
Id. at 11:1â22.
Through it all, the Court has repeatedly declined to play âparks and recâ with the parties.
May 4, 2026, Tr. 12:11. The Court has given the Government âthe benefit of the doubtâ that it
would not âact first and ask forgiveness later.â Id. at 12:22, 23:7.
The Government then did precisely what Plaintiffs feared. Sometime between the
September 3 hearing and October 2, plans moved from removing only hazardous, dead, dying, or
invasive trees to removing hundreds of healthy, non-invasive trees. And then it removed them
without providing meaningful notice to Plaintiffs or the Court.
Specifically, sometime in September, Griess asked his staff to provide him with a tree
management plan. Oct. 12 Rough Tr. at 44:9â11. On October 2, he received the TMP from one
of his architects. Id. at 45:2â46:7. The TMP purports to implement âcertain vegetation
treatment recommendations included inâ a June 2019 Cultural Landscape Report, titled
âNational Park Service Golf Courses in the District of Columbia: East Potomac Park, Langston,
and Rock Creek: Treatment Guidelines.â17 Dkt. 74-1 ¶ 7. Griess submitted the TMP and
funding request to NPS on October 5; Bowron authorized execution of the TMP the next day.
Oct. 12 Rough Tr. at 21:17â22:23.
At some point on October 5, Wischer directed Lands to implement the CLR (as it related
to the East Potomac Golf Course) âas soon as practical.â See id. at 95:6â97:4. Agency counsel
attended this meeting. Id. at 77:13â17. Wischer did not explain the urgency, id. at 96:1â9, and
both Griess and Lands testified there was (and remains) none, id. at 50:4â6, 78:17â19, 111:9â12.
17
The CLR recommended treatment guidelines for three golf courses in Washington, D.C. See
Dkts. 41â44. The Government here pursued the CLRâs recommendations only with respect to
East Potomac Golf Course.
7
For his part, Griess initially stated in a written declaration that the work began in October
2026 because he had ânow received temporary workforce supportâ and âadditional budgetary
resources.â Dkt. 74-1 ¶ 6. The workforce issue remains unclear. But Griess later testified that
he had not received any additional budgetary resources. Oct. 12 Rough Tr. at 31:13â33:15. He
could have submitted the TMP, from a budgetary perspective, at any point. Id. at 32:23â33:2.
Despite the lack of any urgency, people acted urgently. During the week of October 5, a
spate of officials worked on developing and implementing the TMP. See id. at 106:3â23. This
included coordinating various entities and individuals at âheadquarters, region, and park level.â
Id. at 105:23â25. Griess announced the culmination of these efforts in a Categorical Exclusion
Documentation Form dated October 9. He deemed the plan âroutine maintenanceâ that, since it
âis consistent with established preservation objectives for the historic cultural landscape,â is
categorically exempt from further NEPA analysis. See CatEx Form 1 at 5.
The Government acted urgentlyâinternally, that is. There was no comparable rush when
it came to providing Plaintiffs or the Court notice of the TMP. The Government did not provide
any notice until 4:55 p.m. on Friday, October 9. Dkt. 74. That is, a week from when Griess
received the draft plan and four days from when agency counsel first became aware something
was afoot. Oct. 12 Rough Tr. at 45:2â46:7, 96:23â97:9. The notice, when it came, announced
that NPS planned to remove âup to 529 treesâ from the Course to ârestor[e] and maintain[] the
Golf Courseâs historic links-style character.â Dkt. 74-1 ¶¶ 13, 20. The Government planned to
begin removal the next day in Zone A, which it estimated contained 169 trees. Id. ¶ 19.
And, indeed, beginning around 8:00 a.m. on Saturday, October 10, the Government razed
nearly 430 trees, none of which were hazardous or posed safety concerns. See Dkt. 76-1 at 7;
Oct. 12 Rough Tr. at 39:16â21. The next day, Griess signed off on âadditional removalsâ of
8
âimmatureâ trees in a second Categorical Exclusion form. CatEx Form 2 at 2. Today, about 300
additional trees are on the literal chopping block. Oct. 12 Rough Tr. at 12:18â20.
Plaintiffs, caught off guard by Defendantsâ late-breaking October 9 notice, asked to meet
and confer. The parties met on Sunday, October 11. Dkt. 76-1 at 7â8. Plaintiffs then learned
three things. First, the âoperation was proceeding âfaster than anticipated.ââ Id. at 8. Second,
âcontrary to [Griessâs] Friday declaration[,] hundreds of additional trees would be felled
imminently.â Id. Third, âthe tree-razing w[ould] resume as soon as the weather permits.â Id.
Late that evening, Plaintiffs moved for a TRO. Dkt. 76. They claim that NPS and DOI
violated NEPA by failing to comply adequately with the statuteâs procedural and substantive
requirements before cutting down hundreds of trees on the East Potomac Golf Course. See Dkt.
76-1 at 9â10.
The Court ordered Defendants not to remove any more trees until 7:00 a.m. on October
13, 2026. Min. Order (Oct. 12, 2026). The Court held an emergency hearing on October 12, at
which Griess and Lands testified, and the Court extended the stay until 2:00 p.m. This opinion
follows.
STANDARD
To obtain a temporary restraining order, a plaintiff must show âthat he is likely to
succeed on the merits, that he is likely to suffer irreparable harm in the absence of preliminary
relief, that the balance of equities tips in his favor, and that an injunction is in the public
interest.â Winter v. NRDC, 555 U.S. 7, 20 (2008). Where, as here, a movant seeks to enjoin the
government, the final two factors merge âbecause the governmentâs interest is the public
interest.â Pursuing Am.âs Greatness v. FEC, 831 F.3d 500, 511 (D.C. Cir. 2016).
9
DISCUSSION
I. Likelihood of Success
A. Standing
1. Recreational and Aesthetic Injuries
Plaintiffs must show a likelihood of success that they have standing. Food & Water
Watch, Inc. v. Vilsack, 808 F.3d 905, 913 (D.C. Cir. 2015). To do so, âplaintiffs must state a
plausible claim that they have suffered an injury in fact fairly traceable to the actions of the
defendant that is likely to be redressed by a favorable decision on the merits.â Id. (cleaned up).
The injury must be âconcrete, particularized, and actual or imminent.â TransUnion LLC v.
Ramirez, 594 U.S. 413, 423 (2021).
âIf at least one plaintiff has standing, the suit may proceed.â Biden v. Nebraska, 600 U.S.
477, 489 (2023). And so, for now, the Court will address only the individual plaintiffsâ standing.
Plaintiffs Alex Dickson and Dave Roberts frequent the East Potomac Golf Course. Dkt. 8-4
¶¶ 5â6; Dkt. 8-6 ¶ 2. Dickson visits the Course âat least a few times a month, often more,â Dkt.
8-4 ¶ 6, and Roberts visits âat least once per month,â Dkt. 8-6 ¶ 2. At the Course, the men often
play golf alone, with friends, or with their children. Dkt. 8-4 ¶¶ 6â8, 10; Dkt. 8-6 ¶¶ 9â11, 17.
Both men appreciate the Courseâs âdeep sense of historyâ and âbeauty.â Dkt. 8-4 ¶¶ 12, 17â18;
see Dkt. 8-6 ¶¶ 12, 20, 22. And both men benefit from the Courseâs public status, which makes
it accessible to âaverage . . . working-class golfersâ who may not be able to afford private
courses. Dkt. 8-4 ¶¶ 14â15, 20; see Dkt. 8-6 ¶ 20. Plaintiffs also credit the Courseâs welcoming,
communal environment to its public status. Dkt. 8-4 ¶ 15; Dkt. 8-6 ¶ 15.
Plaintiffs allege that the Governmentâs implementation of the Washington National Plan,
in part through the TMP, would harm their ârecreational, aesthetic, historical, and communal
10
interests in East Potomac Park and East Potomac Golf Course.â Dkt. 76-1 at 13. Dickson and
Roberts have both stated that they would notâand could notâcontinue playing with the same
frequency if renovations proceed. Dkt. 8-4 ¶ 21; Dkt. 8-6 ¶¶ 21, 25.
At this juncture, the individual plaintiffs have met their burden to establish standing.
Concrete Injury. Plaintiffs present concrete injuries: the infringement of their
recreational and aesthetic interests. Dkt. 8-4 ¶ 19; Dkt. 8-6 ¶ 25. âIt is well established that
environmental plaintiffs adequately allege standing when they aver that they use the affected
area and are persons for whom the aesthetic and recreational values of the area will be lessened
by the challenged activity.â Ctr. for Bio. Diversity v. DOI, 144 F.4th 296, 305â06 (D.C. Cir.
2025) (collecting cases) (cleaned up). And so it is here. Plaintiffs use East Potomac Golf
Course; enjoy its recreational and aesthetic benefits; and would decrease their use if the
Washington National Plan proceeds. Dkt. 8-4 ¶¶ 6â8, 12, 17â18, 21; Dkt. 8-6 ¶¶ 2, 9â12, 17,
20â22, 25.
True, the Supreme Court recently reaffirmed in a per curiam order that âmere offense,
disagreement, or distaste does not qualify as a concrete and particularized injury under Article
III.â NPS v. Natâl Tr. for Historic Pres. in the U.S., No. 26A203, 2026 WL 2564318, at *2 (Aug.
31, 2026) (per curiam). But, in the same order, the Court also reaffirmed that it has âfound
standing in certain environmental cases where the plaintiffâs injuries involved more than mere
offense,â such as an interference with the plaintiffâs ârecreational interests.â Id. Plaintiffs do not
allege mere offense at the activities at East Potomac Golf Course: Plaintiffsâ declarations detail
specific recreational and aesthetic interests, including Plaintiffsâ intent to continue playing golf
on the Course. Dkt. 8-4 ¶ 19; Dkt. 8-6 ¶ 25.
11
Imminence. Plaintiffsâ threatened injuries are imminent. The Government has already
cleared hundreds of trees and has stated its intent to clear âhundreds of additional trees.â Dkt.
76-1 at 8. Only the vagaries of Mother Natureâand then this Courtâs equitable powersâhalted
the Governmentâs tree-clearing operations. See id.
Traceability and Redressability. Plaintiffsâ injuries are fairly traceable to the
Governmentâs conduct and likely to be redressed by a favorable decision. The Governmentâs
rapid implementation of the TMP caused Plaintiffsâ recreational and aesthetic injuries by
âinterfer[ing] with their longstanding use of a place that exists for that use.â Id. at 20. And an
injunction enjoining further tree-clearing would redress Plaintiffsâ injuries by halting operations
until the Government completes sufficient NEPA review. Id. at 21.
2. Procedural Injury
Plaintiffs also claim that they will suffer a procedural injury if the Government clears
additional trees without first complying with NEPAâs requirements. See id. at 29â30. The D.C.
Circuit has recognized that a plaintiffâs âinjury may result from an agency action that failed to
follow some statutorily required procedure, such as completing NEPA environmental
review . . . prior to undertaking a specific action.â Ctr. for Bio. Diversity, 144 F.4th at 304
(cleaned up). If Plaintiffs establish a procedural injury under NEPA, the imminence and
redressability requirements âare somewhat relaxed.â Id.
Concrete Injury. Plaintiffs must show a violation of a procedural right and connect it to
a substantive interest. See Mendoza v. Perez, 754 F.3d 1002, 1010 (D.C. Cir. 2014). At this
early stage, Plaintiffs adequately tie the Governmentâs failure to comply with NEPAâs
procedural requirements to their concrete recreational and aesthetic interests: Plaintiffs assert
that the Governmentâs failure to adequately consider the environmental impacts of the TMP has
12
materially affected Plaintiffsâ aesthetic and recreational interests in the Course. See Dkt. 76-1 at
20â21.
Traceability. Plaintiffs have also shown that their procedural injury is traceable to the
Governmentâs implementation of the TMP. â[I]n a case alleging a procedural deficiency, an
adequate causal chain must contain at least two links: one connecting the omitted [procedural
requirement] to some substantive government decision that may have been wrongly decided
because of the lack of [the procedural requirement] and one connecting that substantive decision
to the plaintiffâs particularized injury.â WildEarth Guardians v. Jewell, 738 F.3d 298, 306 (D.C.
Cir. 2013) (cleaned up).
As to the first link, Plaintiffs need only âshow that the procedural step was connected to
the substantive result.â Id. (cleaned up) Here, Plaintiffs have likely shown that the
Governmentâs expedited Categorical Exclusion procedures resulted in the premature
implementation of the TMP. See Dkt. 76-1 at 15â17, 23â25. As to the second link, Plaintiffs
have plausibly connected the Governmentâs implementation of the TMP to the Washington
National Plan, and therefore with their recreational and aesthetic injuries. See id. at 8.
Imminence and Redressability. Plaintiffs easily satisfy the relaxed imminence and
redressability requirements. âIf the [Government] is required to adequately consider each
environmental concern, it could change its mind aboutâ proceeding with the TMP. WildEarth
Guardians, 738 F.3d at 306. Here, that is enough.
B. Final Agency Action
Final agency action presents the closest call in the Courtâs analysisâan analysis made
more difficult by this caseâs unique procedural posture.
13
Plaintiffs may sue under the Administrative Procedure Act for failure to comply with
statutory requirements so long as the agency has undertaken a final agency action. See 5 U.S.C.
§§ 704; 706(2)(C)â(D). A final action âmark[s] the consummation of the agencyâs
decisionmaking processâ and is the mechanism âby which rights or obligations have been
determinedâ or from which âlegal consequences will flow.â Bennett v. Spear, 520 U.S. 154,
177â78 (1997) (cleaned up). An agency action does not escape review merely because the
agency undertakes it to advance a broader policy; the action need only âreflect a discrete
decision.â Hennepin Cnty. v. HHS, No. 26-cv-2460, 2026 WL 2426300, at *7 (D.D.C. Aug. 19,
2026). Such an action is final when it is ânot itself subject to further consideration by the
agency.â NRDC v. Wheeler, 955 F.3d 68, 78 (D.C. Cir. 2020).
Plaintiffs have identified the TMP as a relevant final agency action. Dkt. 76-1 at 8â9.
The TMP identifies, by zone and description, each tree to axe. See id. at 9â10 (citing CatEx
Form 1). Griess finalized the TMP on October 5; Bowron approved it on October 6; NPS acted
on it by removing approximately 430 trees on October 10; and, but for the weather, NPS would
have removed hundreds more on October 11. See id. at 8; Oct. 12 Rough Tr. at 9:5â7, 11:12â16,
21:17â22:23, 47:9â12.
The Government insists that the Washington National Plan âremain[s] in the conceptual
stageâ and is therefore not final. Dkt. 75-3 ¶ 6. But the situation has changed materially on this
point since Plaintiffs filed suit in February, including, for example, President Trump in June
directing the Washington National Plan to commence on September 1, and the implementation of
the TMP on October 10. June 28 Post; CatEx Form 1.
The Court need not determine the finality of the Washington National Plan. On this
sparse record, the Court credits Plaintiffsâ assertion that the TMP is a âdistinct, if interrelated,
14
strateg[y] for implementingâ the Washington National Plan. Hennepin Cnty., 2026 WL
2426300, at *8. âAn interim agency resolution counts as final agency action despite the potential
for a different permanent decision,â so long as the interim decision is the âfinal word from the
agency on what will happen up to the time of any different permanent decision.â NRDC, 955
F.3d at 78. The TMP is indisputably final, and so the Court may review it.
The Government contends that the TMP has nothing to do with President Trumpâs
decision, much less this litigation. Dkt. 74-1 ¶ 16. It claims that the TMP merely implements
the 2019 CLR. Id. ¶ 7. The Court is skeptical. Having not yet heard from Bowron or Wischer,
the Court is left with the following facts. The President announced that work on the Washington
National Plan would begin on September 1. See Dkt. 58 at 1. On October 5, Wischer instructed
Lands to implement the CLR âas soon as practicalâ but provided no explanation for the
urgency. See Oct. 12 Rough Tr. at 95:20â96:19. Griess testified there is none. Id. at 50:4â
11. And Griess, at the emergency hearing, walked back his written claim that work began in
October because budgetary resources had become available. Id. at 32:23â33:15. Even though
the CLR covers numerous types of improvements (such as structure and boundary, along with
vegetation) at each of D.C.âs three public golf courses, Dkts. 41â44, the TMP covers only tree
removal at the East Potomac Golf Course, CatEx Form 1; CatEx Form 2. Coincidentally, then,
NPSâs only implementation of the 2019 CLR is consistent with the Presidentâs express desire to
redesign the East Potomac Golf Course. See Oct. 12 Rough Tr. at 90:23â92:1; June 28 Post.
The Court concludes, on this limited record, that government officials raced to undertake
the TMP because President Trump demands haste on his redesign, and not because of some
newfound zeal to implement a small part of a seven-year-old CLR.
15
C. NEPA Claim
Plaintiffs are likely to succeed on the merits of their claim that the development of the
TMP failed to comply with NEPAâs procedural and substantive requirements.
NEPA ensures that agencies âtake a hard look at the environmental consequences before
taking a major action.â Balt. Gas & Elec. Co. v. NRDC, 462 U.S. 87, 97 (1983) (cleaned up). It
ârequires agencies to prepare an environmental impact statement when they approve a major
Federal action significantly affecting the quality of the human environment.â Sierra Club v.
FERC, 153 F.4th 1295, 1303 (D.C. Cir. 2025) (cleaned up). Alternatively, the agency must
prepare an âenvironmental assessmentâ if it concludes that the action will not have a reasonably
foreseeable significant environmental impact. 42 U.S.C. § 4336(b)(2).
NPS prepared neither an environmental impact statement nor an environmental
assessment before implementing the TMP. Instead, NPS claims it documented compliance with
NEPA through its publication of two Categorical Exclusion forms. Dkt. 74-1 ¶ 15; Oct. 12
Rough Tr. at 80:19â20. NPS published the first on October 9, the day before tree clearing began.
See CatEx Form 1 at 10. It published the second on October 11, after it had razed 430 trees, 200
more than initially estimated. See CatEx Form 2 at 2, 6.
The NEPA Handbook requires that âbefore applying a categorical exclusion, each
proposed action must undergo a review to determine that it applies and that no extraordinary
circumstances exist (see 43 CFR 46.215).â 91 Fed. Reg. 8738, 8755 (Feb. 24, 2026).
Extraordinary circumstances exist where, for example, the agencyâs proposed action would
â[h]ave significant impacts on such natural resources and unique geographic characteristics as
historic or cultural resources; [or] park, recreation or refuge lands.â 43 C.F.R. § 46.215 (2026).
16
Griess certified that extraordinary circumstances did not apply, writing that â[t]he
proposed action would not have significant impacts on [the] natural resources or unique
geographic characteristicsâ of the historic East Potomac Golf Course. CatEx Form 1 at 5. The
TMP, recall, was initially to remove hundreds of trees, including nearly every tree in the
Courseâs interior. See CatEx Form 1 at 5â6, 10â11. Griess signed this certification on October
9, within one week of receiving the draft TMP and four days after sharing the TMP with
Bowron. See Oct. 12 Rough Tr. at 34:5â8, 21:17â22:23, 45:20â23, 46:4â5.
On October 10, NPS knowingly destroyed two hundred additional trees âidentified and
removed beyondâ what the first Categorical Exclusion form contemplated. See CatEx Form 2 at
2. âThe initial assessment,â Griess noted, âestimated approximately 169 trees within this area;
however, the dense vegetation made it difficult to accurately identify and inventory individual
trees. During removal activities, an additional 200 trees were identified and removed beyond the
original estimate.â Id. Griess attributed NPSâs severe underestimate in the first Categorical
Exclusion form to the size of the trees, which âgenerally rang[ed] from 3 to 5 inches in diameter
at breast height.â Id.
Perhaps. Or perhaps the oversight occurred because the agencyâs NEPA compliance
efforts lasted mere days. Plaintiffs highlight that ahead of a similar tree-removal project at Rock
Creek Golf Course in 2023, âNPS published an Environmental Assessment spanning more than
250 pages and needed six months of analysis to issue a Finding of No Significant Impact,â which
itself âran more than 300 pages.â Dkt. 76-1 at 27 & nn.5â6. Presumably that assessment of the
forest did not miss half its trees.
Even at this preliminary stage, Plaintiffs have shown that it is unlikely that NPS and DOI
complied with NEPAâs âhard lookâ requirement before beginning tree removals. See Balt. Gas
17
& Elec. Co., 462 U.S. at 97. At a minimum, Plaintiffs are likely to succeed on their claim that
NPS ran afoul of NEPA by destroying the trees outside of those identified in the first Categorical
Exclusion form. For obvious reasons, NEPA requires review before âresources have been
committed or the die otherwise cast.â Robertson v. Methow Valley Citizens Council, 490 U.S.
332, 349 (1989).
There is more. In the second Categorical Exclusion form, Griess highlights:
Additional review is necessary to document the discrepancy between the
estimated and actual number of trees removed, evaluate whether the
additional removals resulted in effects beyond those previously assessed,
and determine whether further analysis or consultation is warranted under
the National Environmental Policy Act (NEPA), Section 106 of the
National Historic Preservation Act (NHPA), or other applicable
environmental compliance requirements.
CatEx Form 2 at 2. The record does not reflect whether NPS has undertaken this additional
review, lending further support for a TRO preventing the Government from taking additional
harmful action without proper analysis.
Plaintiffs also make a NEPA segmentation claim. See Dkt. 76-1 at 24. âAn agency
impermissibly âsegmentsâ NEPA review when it divides connected, cumulative, or similar
federal actions into separate projects and thereby fails to address the true scope and impact of the
activities that should be under consideration.â Myersville Citizens for a Rural Cmty., Inc. v.
FERC, 783 F.3d 1301, 1326 (D.C. Cir. 2015) (cleaned up). The Court need not assess this claim
now to grant Plaintiffsâ motion. And it needs further briefing from the parties before it can
assess it fully.
18
II. Irreparable Harm
Plaintiffs must demonstrate that the harm they will suffer is âboth certain and greatâ
and âactual and not theoreticalâ to demonstrate irreparable harm meriting injunctive relief. Wis.
Gas Co. v. FERC, 758 F.2d 669, 674 (D.C. Cir. 1985). They have met that burden.
This Court has previously held that âan established NEPA violation might rise to the
level of irreparable harm when coupled with sufficient evidence of environmental injury.â
Sierra Club v. U.S. Army Corps of Engârs, 990 F. Supp. 2d 9, 41 (D.D.C. 2013). Here, the Court
can measure the evidence of environmental injury by looking at the tree trunks littering Zone A
of the East Potomac Golf Course and counting those trees left standing (for now) in Zones B and
C. And, while by no means automatically, healthy tree removal can âclear the bar of irreparable
harm.â Comm. of 100 on Fed. City v. Foxx, 87 F. Supp. 3d 191, 204â05 (D.D.C. 2015)
(collecting cases).
When a plaintiff has demonstrated a âprocedural violation of NEPAâ as well as âa
showing of environmental or aesthetic injury, courts have not hesitated to find a likelihood of
irreparable injury.â Brady Campaign to Prevent Gun Violence v. Salazar, 612 F. Supp. 2d 1, 24
(D.D.C. 2009). The Court does not hesitate here. Plaintiffs note that if no injunctive relief is
awarded, âthe ground, landscape and vistas will be irrevocably alteredâ because âdestroyed trees
cannot be replaced.â18 Dkt. 76-1 at 29. And Rebecca Miller, the Executive Director of the DC
Preservation League, has noted that implementation of the TMP at the Course will cause East
18
Just ask the Lorax. As an aside, the Court has just learned that Dr. Seuss âwork[ed] late into
the night,â toiling over how to depict âthe smallish gopher-like creature called the Loraxâ for âa
full year.â Cynthia Gorney, Dr. Seuss, Wash. Post (May 20, 1979), https://perma.cc/FL6F-
NKTE. But then, while on vacation in Africa, Dr. Seussâinspired by the sight of a herd of
elephantsâââpicked up a laundry pad and wrote the whole book that afternoon.ââ Id. The Court
has seen no elephants. And it has certainly had less than a year to write. But it very much
appreciates that her clerks know something of late-night work and industrious afternoons.
19
Potomac Park to lose its designation criteria as a contributing site for East and West Potomac
Park Districtâs listing on the National Register of Historic Places. Dkt. 76-3 at 3. There is no
adequate remedy at law for such harm.
III. Balance of the Equities and the Public Interest
The balance of the equities tips sharply in favor of Plaintiffs. Lands, in his sworn
testimony, could provide no reason that NPS needed to implement the TMP urgently. See Oct.
12 Rough Tr. at 78:17â21, 95:18â96:10. Griess further testified that no urgency exists in
removing the remaining trees:
The Court: Is there any urgency of continuing with the tree removal?
Griess: Not that Iâm aware of, Your Honor.
The Court: So the trees could be cut down tomorrow, or they could be
cut down a month from now, and from the governmentâs
perspective, itâs basically the same?
Griess: From what I understand, Your Honor, yes.
Id. at 50:4â10. And given that the Court has found that Plaintiffs are likely to succeed on the
merits of their NEPA claim, â[t]here is generally no public interest in the perpetuation of
unlawful agency action.â League of Women Voters of U.S. v. Newby, 838 F.3d 1, 12 (D.C. Cir.
2016).
On the other hand, Plaintiffs will suffer further irreparable harm if the trees in Zones B
and C are axed in line with the Governmentâs proposed TMP implementation, and would be left
with no recourse at law, despite diligently pursuing these claims over several months.
20
CONCLUSION
For the reasons stated above, the Court GRANTS Plaintiffsâ Emergency Motion for
Temporary Restraining Order, Dkt. 76. The Court ORDERS that the Temporary Restraining
Order shall be in effect through Monday, October 26, 2026. Plaintiffs shall post a $1.00 bond in
accordance with Federal Rule of Civil Procedure 65(c) by October 19, 2026.
A separate Order consistent with this Memorandum Opinion issues this day.
Date: October 13, 2026
ANA C. REYES
United States District Judge
21